Hello!

Did you know that logged in users can see a lot more content?

ASDO tie rod system 2


Software version: Not version-specific

Last updated May 16, 2014 by Trimble Solutions Sweden tekla.support.se@trimble.com

Environment: 
Not environment-specific

ASDO tie rod system 2

Select two points in the direction you wish to place the tie rod system 2. Important here is to set the start point on the left and the direction on the right to get the position in depth of the component correct. The yellow handle symbolizes the start point and the purple handle the end point of the component. The points are positioned in the middle of the holesmall hollow open throughout a part or assembly that is usually used for fastening parts with bolts or other such objects

Hole is created in the same way as bolts and hole properties are defined in the bolt properties.

in the fork end.


For tie rod system load capacity, please click this web-link: 

http://www.cad.anker.de/tekla 

Settings for the tie rod system 2

1. Select appropriate size of the tie rod system 2 and press load. All values are automatically loaded into dialog.

2. You can also select material etc under the parameters tab. The material selection is related to the tie rod system size. Observe that corrosion protection HDG and Plain cannot be used with ASDO 600-E and A4 cannot be used with ASDO 350-S, ASDO 520-S and ASDO 690-S.
3. Type is generated from size and selections made.
4. The different attribute files for the integrated components can be chosen.

Quick feedback

The feedback you give here is not visible to other users. We use your comments to improve our content.
We use this to prevent automated spam submissions.
Content rating: 
No votes yet