Hello!

Did you know that logged in users can see a lot more content?

Pour management

Added April 1, 2016 by Tekla User Assistance tekla.documentation@trimble.com

Software version: 
2016

Pour management

Pour management

With the pour management functionality of Tekla Structures , you can view the geometry of cast-in-place concretecast unit type where the concrete is formed, poured, and cured in its final position

structures, show them as parts or as pour objects, plan pours and pour breaks, and report pour information, such as concrete volumes and formwork areas. You can define pours, pour objects, and pour breaks for concrete parts whose cast unit typeproperty of a concrete part in a cast unit that defines if the structure type of the part is precast or cast in place

is Cast in place.

In Tekla Structures , a pour objectbuilding object that is formed of one or more cast-in-place concrete parts, or a part of a cast-in-place concrete part

The cast-in-place concrete parts are merged into one pour object if they have the same material grade and pour phase, and if they touch each other. Pour objects are visible in pour view.

is a building objectobject that represents something that will exist in the real building or be closely related to it

A building object is always created in a model, but it is also represented as a drawing object in a drawing in which its properties can be modified.

that consists of one or more cast-in-place concrete parts. The cast-in-place concrete parts are merged into one pour object if they have the same material grade and they touch each other. They also need be in the same pour phasepart property that defines which cast-in-place concrete parts form a pour object

Pour phase can be used to prevent cast-in-place concrete parts from merging into one pour object.

to be merged. Pour objects are visible in pour views.

A pour is a group of pour objects that is poured at one go.

With a pour breakbuilding object used to split a pour object into smaller pour objects

you can split a pour object into smaller pour objects.

Note:

The pour management functionality is mainly targeted at contractors for quantity take-off, planning, and on-site activities. By default, the pour management functionality is enabled only in the Contractor role. If you are using another role, you must enable the functionality by using the advanced option XS_ENABLE_POUR_MANAGEMENT.

Quick feedback

The feedback you give here is not visible to other users. We use your comments to improve our content.
We use this to prevent automated spam submissions.
Content rating: 
No votes yet